Home / Schemes/Projects / Design Tool-7 – Environmental, Social, Gender, Occupational Health & Safety and QA/QC Protocols

Design Tool-7 – Environmental, Social, Gender, Occupational Health & Safety and QA/QC Protocols Last Updated : Sat, 21 Nov 2026

JSV Design Tool-7 – ESHS, Gender, OHS and QA/QC Protocols – Himachal Pradesh

Design Tool-7 – Environmental, Social, Gender, Occupational Health & Safety and QA/QC Protocols – Jal Shakti Vibhag (JSV), Himachal Pradesh

Enter the physical, social and workforce particulars of a water supply scheme. The tool screens the risks and prepares the site-specific Environmental Management Plan, Muck Disposal Plan and clearance checklist; the Social Safeguard Plan, voluntary land donation formats and grievance matrix; the Gender Action Plan, camp sanitation and wage-audit sheet; activity-specific safety SOPs, PPE matrix and emergency response plan; and the stage-wise inspection and test plan, hydro-test logs and BIS 10500 water testing plan.

I1. Scheme particulars
I2. Environmental inputs – slope, forest land, muck, source
I3. Social inputs – vulnerable households, land donation, kuhls and baoris, grievance levels
I4. Gender inputs – VWSC, Jal Sakhis, labour
I5. Occupational health and safety inputs
I6. QA / QC inputs – pipes, pumps, WTP, laboratory
Preliminary planning and documentation aid for departmental use. The statutory references, thresholds, staffing ratios, test frequencies and acceptance limits that appear are typical values from Indian Standards, Jal Jeevan Mission guidance, labour and environmental law as understood at the time of preparation; they are shown as editable defaults and must be checked against the current Acts, Rules, notifications, BIS standards, the funding agency's safeguard policies and the contract documents before adoption. Labour-law references in particular are changing (the Labour Codes) – confirm which provisions are in force. The generated plans are drafts for the Executive Engineer / Project Management Unit to review, adapt and sign.